SUNSYSTEM / Commissioning
The right start
matters.
Please familiarise yourself with the terms and prices for commissioning. Request a visit online or contact our service centre by phone.
Your comfort.
Our commitment.
Clear terms
Price list for commissioning
| Description | Price incl. VAT (EUR) |
|---|---|
| BURNiT WBS AC UB series boiler | 76,69 € |
| BURNiT PelleBurn series boiler | 76,69 € |
| BURNiT PyroBurn series boiler | 76,69 € |
| BURNiT Combi Burn DC A series boiler | 76,69 € |
| BURNiT Pell Easy boiler | 76,69 € |
| BURNiT Pell series burner | 76,69 € |
| BURNiT pellet stoves /13kW, 18kW, 25kW/ | 58,80 € |
| BURNiT pellet stoves /8kW, 10kW/ | 46,02 € |
| BURNiT Pell Mega pellet burner | 153,39 € |
| SUNSYSTEM MONO / SPLIT heat pump package | 102,26 € |
| New settings for pellet change and unjustified visit /excluding transport/ | 40,90 € |
| Transport | As per the price list |
Clear terms
Price list for troubleshooting with materials provided by the customer
| Description | Price incl. VAT (EUR) |
|---|---|
| Boilers – BURNiT Advance UB, BURNiT Advance PLB, BURNiT Advance DC-A | |
| Hopper and auger installation | 51,13 € |
| Chimney installation | 51,13 € |
| Connecting the water pump to the boiler (where it will be controlled by the boiler). | 25,56 € |
| Filling with heat transfer fluid and system bleeding | 51,13 € |
| Room thermostat installation /excluding transport/ | 51,13 € |
| Wi-Fi module installation /excluding transport/ | 51,13 € |
| Stoves with water jacket | |
| Chimney installation | 51,13 € |
| Filling with heat transfer fluid and system bleeding | 51,13 € |
| Room thermostat installation /excluding transport/ | 51,13 € |
| Wi-Fi module installation /excluding transport/ | 51,13 € |
| Hot air stoves | |
| Connected to the chimney flue | 51,13 € |
| Burners – BURNiT Pell, BURNiT Pell Mega, BURNiT Pell Eco | |
| Mounting the burner to a BURNiT WBS boiler | 76,69 € |
| Hopper and auger installation | 51,13 € |
| Flue pipe installation | 51,13 € |
| Connecting the water pump to the burner (where it will be controlled by the burner) | 25,56 € |
| Filling with heat transfer fluid and system bleeding | 51,13 € |
| Room thermostat installation /excluding transport/ | 51,13 € |
Preparing for the visit
Commissioning requirements
Boilers
To commission BURNiT Advance UB, BURNiT Advance PLB and BURNiT Advance DC-A boilers, please prepare the following:
- The hopper and auger must be installed according to the instructions for the specific model.
- The chimney must be installed according to the requirements in the instructions.
- A 220 V power supply must be available.
- The water pump must be connected to the boiler if the boiler is to control it.
- The system must be filled with heat transfer fluid and bled.
- A three-way valve is mandatory and must be installed.
Pellet stoves with water jacket
For the commissioning of BURNiT pellet stoves with water jacket, the following conditions must be met:
- Installed in accordance with the Installation and Operation Instructions for the respective product (installed with a minimum clearance of 20 cm from walls and flammable materials).
- Chimney installed in accordance with the Installation and Operation Instructions for the respective product.
- 220 V electrical power supply provided.
- System filled with heat transfer fluid and bled.
- Air vent, water filter, safety (non-return) valve, pressure gauge.
Air circulation pellet stoves
For the start-up of BURNiT air circulation pellet stoves, the following are required:
- Connection to the chimney according to the instructions for the respective appliance.
- Installation according to the instructions, including a 20 cm clearance from walls and flammable materials.
- 220 V power supply available.
Pellet burners
For the start-up of BURNiT Pell, BURNiT Pell Mega and BURNiT Pell Eco, please ensure:
- The burner is mounted to the boiler in accordance with the instructions for the model.
- The hopper and auger are installed, preferably to the right of the boiler.
- The chimney is constructed according to the installation and operation instructions.
- 220 V power supply.
- The water pump is connected to the burner if the burner is to control the pump.
- The system is filled with heat transfer fluid and bled.
From inspection to handover
What the initial commissioning includes
- Checking the appliance documents – correctly completed warranty card and proof of purchase (invoice or receipt).
- Check – have the installation and operation requirements been met, according to the instructions for the respective product.
- Checking the fuel (pellets) to ensure it complies with the recommendations in the 'Installation Instructions'.
- Functional test of all components within the appliance.
- Initial start-up and adjustment (according to the specific requirements of the particular installation and chimney the appliance will operate with).
- Brief briefing – theoretical and practical, on the methods of operating the appliance in accordance with the 'Installation and Operation Instructions' and 'Warranty Card'.
- Familiarisation with the types of faults and the corresponding messages/indications, as well as their causes.
Contact us
Commissioning request by phone
If you have difficulty with the electronic request form, you can also make a commissioning request by phone.
Our operators are at your disposal every weekday from 08:30 to 17:30.
Unified Information and Service Centre
+359 700 17 343For start-up, maintenance or servicing of equipment installed outside the settlement of the nearest authorised service centre, transport costs are charged additionally.