Please familiarise yourself with the terms and prices for commissioning. Request a visit online or contact our service centre by phone.

Your comfort.
Our commitment.

Maintenance · Adjustments · Repairs

Clear terms

Price list for commissioning

DescriptionPrice incl. VAT (EUR)
BURNiT WBS AC UB series boiler76,69 €
BURNiT PelleBurn series boiler76,69 €
BURNiT PyroBurn series boiler76,69 €
BURNiT Combi Burn DC A series boiler76,69 €
BURNiT Pell Easy boiler76,69 €
BURNiT Pell series burner76,69 €
BURNiT pellet stoves /13kW, 18kW, 25kW/58,80 €
BURNiT pellet stoves /8kW, 10kW/46,02 €
BURNiT Pell Mega pellet burner153,39 €
SUNSYSTEM MONO / SPLIT heat pump package102,26 €
New settings for pellet change and unjustified visit /excluding transport/40,90 €
TransportAs per the price list

Clear terms

Price list for troubleshooting with materials provided by the customer

DescriptionPrice incl. VAT (EUR)
Boilers – BURNiT Advance UB, BURNiT Advance PLB, BURNiT Advance DC-A
Hopper and auger installation51,13 €
Chimney installation51,13 €
Connecting the water pump to the boiler (where it will be controlled by the boiler).25,56 €
Filling with heat transfer fluid and system bleeding51,13 €
Room thermostat installation /excluding transport/51,13 €
Wi-Fi module installation /excluding transport/51,13 €
Stoves with water jacket
Chimney installation51,13 €
Filling with heat transfer fluid and system bleeding51,13 €
Room thermostat installation /excluding transport/51,13 €
Wi-Fi module installation /excluding transport/51,13 €
Hot air stoves
Connected to the chimney flue51,13 €
Burners – BURNiT Pell, BURNiT Pell Mega, BURNiT Pell Eco
Mounting the burner to a BURNiT WBS boiler76,69 €
Hopper and auger installation51,13 €
Flue pipe installation51,13 €
Connecting the water pump to the burner (where it will be controlled by the burner)25,56 €
Filling with heat transfer fluid and system bleeding51,13 €
Room thermostat installation /excluding transport/51,13 €

Preparing for the visit

Commissioning requirements

Boilers

To commission BURNiT Advance UB, BURNiT Advance PLB and BURNiT Advance DC-A boilers, please prepare the following:

  • The hopper and auger must be installed according to the instructions for the specific model.
  • The chimney must be installed according to the requirements in the instructions.
  • A 220 V power supply must be available.
  • The water pump must be connected to the boiler if the boiler is to control it.
  • The system must be filled with heat transfer fluid and bled.
  • A three-way valve is mandatory and must be installed.
Pellet stoves with water jacket

For the commissioning of BURNiT pellet stoves with water jacket, the following conditions must be met:

  • Installed in accordance with the Installation and Operation Instructions for the respective product (installed with a minimum clearance of 20 cm from walls and flammable materials).
  • Chimney installed in accordance with the Installation and Operation Instructions for the respective product.
  • 220 V electrical power supply provided.
  • System filled with heat transfer fluid and bled.
  • Air vent, water filter, safety (non-return) valve, pressure gauge.
Air circulation pellet stoves

For the start-up of BURNiT air circulation pellet stoves, the following are required:

  • Connection to the chimney according to the instructions for the respective appliance.
  • Installation according to the instructions, including a 20 cm clearance from walls and flammable materials.
  • 220 V power supply available.
Pellet burners

For the start-up of BURNiT Pell, BURNiT Pell Mega and BURNiT Pell Eco, please ensure:

  • The burner is mounted to the boiler in accordance with the instructions for the model.
  • The hopper and auger are installed, preferably to the right of the boiler.
  • The chimney is constructed according to the installation and operation instructions.
  • 220 V power supply.
  • The water pump is connected to the burner if the burner is to control the pump.
  • The system is filled with heat transfer fluid and bled.

From inspection to handover

What the initial commissioning includes

  1. Checking the appliance documents – correctly completed warranty card and proof of purchase (invoice or receipt).
  2. Check – have the installation and operation requirements been met, according to the instructions for the respective product.
  3. Checking the fuel (pellets) to ensure it complies with the recommendations in the 'Installation Instructions'.
  4. Functional test of all components within the appliance.
  5. Initial start-up and adjustment (according to the specific requirements of the particular installation and chimney the appliance will operate with).
  6. Brief briefing – theoretical and practical, on the methods of operating the appliance in accordance with the 'Installation and Operation Instructions' and 'Warranty Card'.
  7. Familiarisation with the types of faults and the corresponding messages/indications, as well as their causes.

Commissioning request

Contact us

Commissioning request by phone

If you have difficulty with the electronic request form, you can also make a commissioning request by phone.

Our operators are at your disposal every weekday from 08:30 to 17:30.

Unified Information and Service Centre

+359 700 17 343

service@sunsystem.bg

For start-up, maintenance or servicing of equipment installed outside the settlement of the nearest authorised service centre, transport costs are charged additionally.